I will gauge my day by what happens in the first fifteen minutes. I have had days where every single thing went as smooth as silk, and I spent 10 good hours getting a huge amount of work done. And I have had days where I broke a drill off in the first 5 minutes, mis-tapped a hole because the tap was in the wrong little plastic case, and then stopped and thought about it, and just went off to go see a movie and have a nice lunch. (I take my project plans with me, and sit and peruse them (Sometimes I gaze at them, or even OGGLE them!) while I eat.
No point in beating a dead horse. Or propping him up with sticks and trying to keep him from falling over. Just do something else.