So---Today we reached a "milestone" event in the development of this engine!! The wrist pin with it's brass end-caps was finished and installed earlier today. The piston with con rod connected was dropped down thru the top of the engine and when the big end of the con-rod was visible in the crankshaft area, the coned bushing housings and both halves of the crankshaft were assembled. Everything goes "round and round and up and down" just as I had hoped for. No, it wasn't really that simple. I kept finding minor interferences, chasing them down, removing them, and reassembling things, until eventually the crankshaft would rotate a full 360 degrees without anything inside going "clunk clunk". I have the Loctite 574 on order for sealing the leaded steel cylinder liner into the main aluminum body. All that is outstanding now is the bracket for attaching the ignition points, the ignition cam, and the carburetor, and of course some kind of fuel tank. I plan on using the gear pump I designed and built last year to circulate cooling water thru the engine, and it will be driven by an o-ring drive belt.