So, we're coming down to the wire on this build. Tomorrow I will lap the valves, cut off the handles, and cross drill the ends of the valves for valve spring retainer pins. Will probably also make the valve spring retainers tomorrow. Then I can drill the inlet and exhaust ports in the heads, and drill and tap them for the intake manifold bolts. I need to put a keyway in the crankshaft, and I have to design/build a starter hub. I may build and install a gear guard, although it isn't necessary to run the engine. I haven't done anything yet on the intake manifold/fan mount.----And I need to machine four cams.----And exhaust pipes. I may have to build a crankcase vent valve, but I'm not sure yet. Still have to make proper rocker arm shafts with a c-clip groove on each end. So, probably another couple of weeks work yet.