Im in the process of building a boiler almost exactly like this one.
http://www.youtube.com/comment_servlet?all_comments=1&v=WQ_mBwyTaiM
All my copper tube for steam lines is the same size, Couple Different Brass connections
My Fire Tube will be a 1/2 copper tube going straight into the boiler to a 1/2x1/2x3/4" Copper tee, with another 1/2" copper tube running up for the Smoke stack.
All copper parts will be silver soldered, and all threads will have that white sealant tap, and soldered if its necessary.
Main body is 2"x6" Galvanized Steel Pipe from Home Depot with the Proper Threaded caps
I have a 100 PSI gauge with Siphon, My only problem is my Relief Valve opens at 75 psi it's this one
http://www.homedepot.com/h_d1/N-5yc...splay?langId=-1&storeId=10051&catalogId=10053
Will this setup Handle 75 PSI
http://www.youtube.com/comment_servlet?all_comments=1&v=WQ_mBwyTaiM
All my copper tube for steam lines is the same size, Couple Different Brass connections
My Fire Tube will be a 1/2 copper tube going straight into the boiler to a 1/2x1/2x3/4" Copper tee, with another 1/2" copper tube running up for the Smoke stack.
All copper parts will be silver soldered, and all threads will have that white sealant tap, and soldered if its necessary.
Main body is 2"x6" Galvanized Steel Pipe from Home Depot with the Proper Threaded caps
I have a 100 PSI gauge with Siphon, My only problem is my Relief Valve opens at 75 psi it's this one
http://www.homedepot.com/h_d1/N-5yc...splay?langId=-1&storeId=10051&catalogId=10053
Will this setup Handle 75 PSI