doc1955
Gone
- Joined
- Aug 26, 2009
- Messages
- 1,261
- Reaction score
- 168
Started with the pillars.
Dial in center of pillar to drill 4-40 hole in ends.
Tapping 4-40 holes in ends with my thumb tap wrench.
Holes drilled and slot in sides cut completed.
Drill and ream 5/16 dia crank bearing housing hole.
Holes all drilled.
Mill slots in ends.
Slots completed.
Mill side cuts.
Completed.
Single point threads on hot tube 3/4-32.
Check fit with matting part.
Next time I'll continue with the hot tube cylinders.
Dial in center of pillar to drill 4-40 hole in ends.
Tapping 4-40 holes in ends with my thumb tap wrench.
Holes drilled and slot in sides cut completed.
Drill and ream 5/16 dia crank bearing housing hole.
Holes all drilled.
Mill slots in ends.
Slots completed.
Mill side cuts.
Completed.
Single point threads on hot tube 3/4-32.
Check fit with matting part.
Next time I'll continue with the hot tube cylinders.