Well started power cylinders.
Bore the inside diameter.
Turn up the OD of shoulder this dia mounts into main plate.
Grabbed a 5c collet stop. Need come up with a different stop rod.
Used a carriage bolt had to tun down head slightly.
Ready to face length ah turn shoulder to mount cylinder capp.
Turn shoulder to mount cylinder cap.
Power cylinder blanks done on lathe ready for milling cooling slots. Before cleaning up lathe and moving to mill will turn up power cylinder caps.
Turn up top spud and turn a corner radius on OD and part off.
First side done ready for back side.
Bored 3/16 dia hole .330 depth used a 3/16 end mill.
Bore cap ID to a slip fit on power cylinder will be loctited in place.
Blanks ready for mill work. Clean up lathe and move to the mill.