chuck foster
Well-Known Member
- Joined
- Jul 11, 2007
- Messages
- 704
- Reaction score
- 2
well it has been a long time since i last worked on this engine, i hope to see this project through to the end this time (but one never knows)
first i have to admit that i messed up the original cylinder castings (all 3) i didn't have a rotary table to index all the bolt holes.
these bolt holes are to mount the cylinders to the crank case (8 bolts) and 8 more to mount the heads to the cylinders.
once i figured out the bolt holes were spaced wrong i set out to fabricate some new cylinders.
this picture shows the steel i used to fab the cylinders
and the various stages of turning
i next drilled holes for the bosses were the cooling pipes will attach
i used a dab of loc tite red to help hold the bosses in place
the three cylinder bodies in position
drilling bolt holes in the right spot this time
these cylinders have wet sleeves installed and this picture shows one of the sleeves.
as you can see in these few pictures i made a simple jig to hold the cylinders so i could bore them
all three cylinder bodies waiting to have their sleeves pressed in place
well that's it for tonight, i hope i didn't take up too much of your guy's time.
i will try to keep you guys up to date as this project progresses.
i do have a question for you guys.............has anyone here built this engine or know someone that has???
i have a few questions about the cam and the roller lifters ???
chuck
first i have to admit that i messed up the original cylinder castings (all 3) i didn't have a rotary table to index all the bolt holes.
these bolt holes are to mount the cylinders to the crank case (8 bolts) and 8 more to mount the heads to the cylinders.
once i figured out the bolt holes were spaced wrong i set out to fabricate some new cylinders.
this picture shows the steel i used to fab the cylinders
and the various stages of turning
i next drilled holes for the bosses were the cooling pipes will attach
i used a dab of loc tite red to help hold the bosses in place
the three cylinder bodies in position
drilling bolt holes in the right spot this time
these cylinders have wet sleeves installed and this picture shows one of the sleeves.
as you can see in these few pictures i made a simple jig to hold the cylinders so i could bore them
all three cylinder bodies waiting to have their sleeves pressed in place
well that's it for tonight, i hope i didn't take up too much of your guy's time.
i will try to keep you guys up to date as this project progresses.
i do have a question for you guys.............has anyone here built this engine or know someone that has???
i have a few questions about the cam and the roller lifters ???
chuck