Day Ten.
With a mini lathe the drilling power is not good when you hit 15 mm twist drill. Using my arsenal of drills from 3mm--------13 mm and only 14 15 16 17 18 19 20 mm to rough bore before using boring bare. For rough boring ,used the fixed steady to support job. Due excessive hangout,boring bar did chatter. The last few cuts had the steady removed and nailing biting boring went on to finish bore I.D. Did hit 0.995'' and confirmed with a Holtest Inside Mike. To get to .998" the last three repeat cuts nearly killed the job. Final bored I.D. 1.002''.
Hole bored parallel and confirmed with Holtest Inside Mike at front and rear ends.
Cutting the bottom square flange was another brain bashing. The miiling vise would be another gamble. Went back to the Angle Plate. To prevent end snatch , used 8 mm endmill.
This first cylinder took Day Nine and Ten with Overtime to finish. Cylinder done but with one forgiveable goof-------cylinder bore 2 thou oversized. :hDe:
At last the crankcase did grow one cylinder. Remaining cylinder will be next fortnite.Cast Iron is not my preferred medium. Shirt stained very badly. Boss not happy. Bath Room has to be carefully flushed several times thoroughly to ensure no rust stains.:rant:
Next week taking darling boss to Nagoya,Japan to visit our Japanese daughter-in-law. Will be one week break.
Nagoya weather has warmed up for us. Forecast day temperatures 10--------14 C throughout our stay.