- Joined
- Jul 4, 2017
- Messages
- 20
- Reaction score
- 2
I am considering constructing a vertical boiler out of 16" OD, standard wall (.375" thk.) A-106 Grade B Pipe. This is seamless carbon steel process piping. The tubesheets will be 1/2" thick SA516-70 plate, turned to fit the ID, and welded in.
Question is, is there a down and dirty formula for calculating the number of tubes and their diameter? I was thinking thick walled copper tubes, rolled into the tubesheets.
Thanks,
Britt Bettell
Question is, is there a down and dirty formula for calculating the number of tubes and their diameter? I was thinking thick walled copper tubes, rolled into the tubesheets.
Thanks,
Britt Bettell