Finally finished painting!
Now the bunker is next.View attachment 121588View attachment 121589
https://photos.app.goo.gl/wkHrb9EzSFFGFWZh9
https://photos.app.goo.gl/ca5BjpJfoc3XCF5h7Finally finished painting!
Now the bunker is next.View attachment 121588View attachment 121589
https://photos.app.goo.gl/wkHrb9EzSFFGFWZh9
Not for long, it's already got a few dings in it!Its so shiny
A wonderful conclusion to your construction!!!!!!!!!!!!!!!!Minnesota State Boiler Inspector stopped out today and certified my boiler to operate at 150psi. View attachment 123383
Amazing job you have done. Approx how many hours and dollars into that machine?Minnesota State Boiler Inspector stopped out today and certified my boiler to operate at 150psi. View attachment 123383
I didn't keep track of the time or cost, because some days I just sat & looked at it. On & off for 4 yrs. Yes, I certainly plan on firing it up this spring. The inspector hydro tested the boiler at 1.5 times the working pressure of 150psi. Then we dropped the pressure back to 150psi, it needed to hold for a minimum of 10 minutes. Then he ultra sound tested many areas inside & outside the firebox, also all around the main tube & front - rear flue sheets. A visual inspection of welds and piping. It took him a coupe of hrs. Now we need to alternate between hydro & ultra sound testing every 2 yrs. in Minnesota. I needed this certificate so I can operate at shows this fall.Amazing job you have done. Approx how many hours and dollars into that machine?
May I ask if it will actually be 'fired' to run on steam or ???
Also, what did the inspector do to test or ???? to certify your boiler/pressure vessel?
Thank-you for the advise. On my first fire I need to verify that my mechanical feed pumps work without leaking. Check to make sure my sight glass works correctly. I don't plan on going over a 100psi this first run. Just want to check for leaks & make sure everything functions properly. With the propane test buner I should be able to sneak up on my pressure. I have started a log book, as a private pilot I know the importance of check lists & documentation.Top job! Well done sir!
Remember, for the boiler tests a full fire is required to prove the safety valves function and are adequate, not just the propane burner to raise steam. You know that already having the certificate. But a slave gas burner is an easy way to raise steam and make sure fittings etc. are tight the first time a boiler is fired.
First firing every day check the safety valves lift correctly and pressure and water gauges and injectors and feed pumps all function as they should before you start running. At first, make a list of the checks, - including oiling etc. and keep a log of all running. It's not just good practice, it is a professional approach - which continues the work you have put into building this excellent model.
Enjoy many years of running!
K2