made two more parts that should be completed tomorrow or in a few days, Ill post pictures later on tonight of what they are, I am busy tracking down all the parts that I have made for this engine. Looks like I have everything but Im looking through old photos to see if im missing anything
Thanks for the compliments guys! It is starting to shape up nicely I was not able to do any work to this engine today because it was a shop clean up day, Ill post again monday night with the part I will start and maybe complete.
Last night, me and my father ordered some 1/4 idx 5/8 odx .196 bearings for the flywheel standard piece, so ones those come in I will modify the side plates that I have for the bearings or just make new sideplates
Ok, im now thinking that because technically I am supposed to be learning the cnc machines, I am going to complete this engine on the Haas sl10 and the Haas vf1 that my class has, maybe Ill make another one of this engine scratch.gifscratch.gif
ok, i made 8 parts in the last 2 days, 4 of which were redo's because the crankshaft had up and down wobble, and i made 4 really tiny washers and a new crankshaft out of 1/4 stainless steel
picks to come in a little bit
Well done Mitch its looking really sexy, cant wait to see this baby running
Making me very envious, wish I had the time to do the same, being self employed means I have a crappy Boss !!!
Cheers Frans
thanks a bunch frans, i have been sidetrackd for the past couple weeks working on our christmas project. We are supposed to make 800 screw drivers but they are all going to be made on our haas sl10 cnc lathe, i just have to make a special to aid in the putting together of the screw drivers. Ill post a pic of one of the screw drivers when i can
lol, we are selling over 500 hundred of them to help fund our class, we have a total of 1600 parts to make, production should start in the next couple days