clean the plastic very well to remove all grease
rough up the interior of the shaft hole in the gear very well with 60 or 40 grit paper
place the gear flat on waxed paper and fill the whole with well mixed JB weld NOT JB Quick
allow to cure at room temp for 48 hours
then re machine the bore and keyway
be sure the keyway is at a new location in the gear body
If this gear is still a good fit on its shaft, I would consider cutting the keyway deeper into the gear and making a new key to fit.
Enter your email address to join: