35cc "V" Twin

Home Model Engine Machinist Forum

Help Support Home Model Engine Machinist Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Hi All,
The crankshaft is now closer. I have gone with the pressed in pin. Machined up jig to machine big end pin hole for both parts. Now to machine crank webs and assemble.
Cheers
Andrew
 

Attachments

  • 126.jpg
    126.jpg
    333.9 KB
  • 127.jpg
    127.jpg
    124.3 KB
  • 128.jpg
    128.jpg
    169.4 KB
  • 129.jpg
    129.jpg
    306.8 KB
Hi All,
For every one watching from home, did not get a lot done today, after waiting at the doctors and then running around to arrange scans on my wrist, only got crank done, went with a press fit assy of crank, will spend tomorrow doing final fit and finish on the crankcase assy. There was a lot of setup time for not a lot of machining in the crank webs.
Cheers
Andrew
 

Attachments

  • 130.jpg
    130.jpg
    323.5 KB
  • 131.jpg
    131.jpg
    431.1 KB
  • 132.jpg
    132.jpg
    411.6 KB
How did you machine the counterweights on the crank? Were they done in a mill, or are they separate pieces?
 
Hi All,
Started on the Cylinder heads, after running around this morning getting things done, I also got the blanks cut, then checked and re squared the mill, and machined two blanks to thickness.
And yes the vice was off the mill when checking, I just set up so can see how.
Cheers
Andrew
 

Attachments

  • 133.jpg
    133.jpg
    386.9 KB
  • 134.jpg
    134.jpg
    142 KB
  • 135.jpg
    135.jpg
    318.6 KB
Hi All,
A quick drawing in Autocad 14 and we have the bolt hole layout, have the heads marked out, and then drilled and counter bored, also have the blot hole for the valve rocker mount drilled and tapped.
Cheers
Andrew
 

Attachments

  • 136.jpg
    136.jpg
    59.3 KB
  • 137.jpg
    137.jpg
    306.2 KB
  • 138.jpg
    138.jpg
    383.2 KB
Hi All,
Slow going this morning, had over 2" rain in last 24hrs. Another setup and machining, times 2(many more to go), wobble bar for setup and then machine to fit cylinder. I use copper pads from the PC industry (15mm x 1mm) for smaller parts. Heads sitting on engine.
Cheers
Andrew
 

Attachments

  • 139.jpg
    139.jpg
    403.5 KB
  • 140.jpg
    140.jpg
    266.4 KB
  • 141.jpg
    141.jpg
    229.8 KB
  • 142.jpg
    142.jpg
    272.2 KB
Marked out and machined valve cage pockets and valve spring seats, still waiting on tooling so I can machine out the combustion chamber. This is all for the day as I have a couple of meetings this afternoon.
Cheers
Andrew
 

Attachments

  • 143.jpg
    143.jpg
    322.1 KB
  • 144.jpg
    144.jpg
    307 KB
  • 145.jpg
    145.jpg
    338.7 KB
  • 146.jpg
    146.jpg
    340.3 KB
Hi All,
Not a lot today, only parted or the rear crank web, now to decide which way to go with the crank. As I have no tooling to be able to cut a 0.5mm slot in the crank web for clamping the big end pin, I need to look at machining the crank pin directly in the crankshaft, or machine a hole and press the crank pin in. Will need to look at each and see which way to go.
Cheers
Andrew
wonderful. want to see more.
 
Hi All,
Got a bit more done today, had to make new heads after machining the valve pockets on the wrong side(we all make mistakes). Then machined jig to hold heads for machining out of scrap, then machined out the glow plug holes. Now to start on the inlet and exhaust ports.
Cheers
Andrew
 

Attachments

  • 147.jpg
    147.jpg
    279 KB
  • 148.jpg
    148.jpg
    323 KB
  • 149.jpg
    149.jpg
    84.3 KB
  • 150.jpg
    150.jpg
    401 KB
  • 151.jpg
    151.jpg
    248.4 KB
  • 152.jpg
    152.jpg
    265 KB
  • 153.jpg
    153.jpg
    334.3 KB
  • 154.jpg
    154.jpg
    338.8 KB
  • 155.jpg
    155.jpg
    272.2 KB
Hi All,
All 4 valve cages and valves(316SS) are done, waiting in a new 14mm end mill to finish heads, after the one lent out came back broken, did not have time to look at it when returned as I was just leaving to go and see my daughter who was living at Coffs Harbour at the time.
Cheers
Andrew
 

Attachments

  • 157.jpg
    157.jpg
    281.4 KB
Hi All,
Just arrived, now to get on and finish the heads.
Cheers
Andrew
 

Attachments

  • 158.jpg
    158.jpg
    245.1 KB
Hi All,
For all watching from home, have the inlet and exhaust ports done. Centered, then with a 1/8" end mill, spotted the mark(hard to get a pilot drill to drill straight on a sloping surface), then enlarged hole, 14mm end mill counterbore, drilled and tapped hole. Both heads done, will setup and machine cooling fins this arvo.
Cheers
Andrew
 

Attachments

  • 159.jpg
    159.jpg
    260.1 KB
  • 160.jpg
    160.jpg
    270.2 KB
  • 161.jpg
    161.jpg
    259.6 KB
  • 162.jpg
    162.jpg
    107.4 KB
  • 163.jpg
    163.jpg
    330.5 KB
  • 164.jpg
    164.jpg
    233.5 KB
  • 165.jpg
    165.jpg
    334.1 KB
  • 166.jpg
    166.jpg
    388.7 KB
  • 167.jpg
    167.jpg
    238.9 KB
  • 168.jpg
    168.jpg
    248.9 KB
Hi All,
For all those following from home, I have fitted the valve cages, machined the valve spring retainers, and drilled the ports.
Fitted valves and springs, now at a stand still until I can find another metal supplier as my last has dropped the ball and can't seam to get an order done.
I need some 4mm silver steel, 19mm and 14mm hex 4140 bar.
Cheers
Andrew
 

Attachments

  • 176.jpg
    176.jpg
    173.5 KB
  • 174.jpg
    174.jpg
    313.2 KB
  • 175.jpg
    175.jpg
    206.4 KB
  • 177.jpg
    177.jpg
    303.7 KB
  • 178.jpg
    178.jpg
    324.4 KB
Hi All,
For all wathiching from home, not a lot done, but a lot of different setups. Drilled and tapped the cylinders for the head bolts, machined out the rocker support, needed a piece of scrap from scrap bin to hole the supports for valve spring pockets.
all assembled with all bolts, misplaced(lost) on of the 3mm countersink bolts for the rear plate. Will have to order more.
Had an e-mail from my metal supplier this morning with a new tracking #, maybe this one may turn up. One can only hope.
Can't go any further with it until the material turns up, so tomorrow I will start on the rings, I will finish sizing the cylinders, and then machine the rings.
Cheers
Andrew
 

Attachments

  • 179.jpg
    179.jpg
    306.4 KB
  • 180.jpg
    180.jpg
    411.4 KB
  • 181.jpg
    181.jpg
    347.2 KB
  • 182.jpg
    182.jpg
    386.2 KB
  • 183.jpg
    183.jpg
    348.3 KB
  • 184.jpg
    184.jpg
    396.8 KB
  • 185.jpg
    185.jpg
    278.3 KB
  • 186.jpg
    186.jpg
    351.9 KB
  • 187.jpg
    187.jpg
    320 KB
  • 188.jpg
    188.jpg
    307.8 KB
Hi All,
Got out this morning and got the prop washer and lock nut set done, first lock nut was too long, just got the second shorter one done before the rain started again. The nuts still need heat treatment yet.
Cheers
Andrew
 

Attachments

  • 191.jpg
    191.jpg
    370.8 KB
  • 192.jpg
    192.jpg
    320.6 KB
  • 193.jpg
    193.jpg
    349.2 KB
  • 194.jpg
    194.jpg
    426.8 KB
Hi All,
Blue skies here to day, at least for the morning. Got the rings machined, ground the outer size, finished the inner bore, parted of the rings, machined a holder to finish rings, light press fit, will use the holder to lap the outer sides, and finish to fit pistons.
Will post more later.
Cheers
Andrew
 

Attachments

  • 197.jpg
    197.jpg
    497.3 KB
  • 198.jpg
    198.jpg
    414.6 KB
  • 199.jpg
    199.jpg
    499.9 KB
  • 200.jpg
    200.jpg
    389.9 KB
  • 202.jpg
    202.jpg
    327.5 KB
  • 203.jpg
    203.jpg
    377.7 KB
  • 204.jpg
    204.jpg
    261 KB
  • 205.jpg
    205.jpg
    247.2 KB
  • 206.jpg
    206.jpg
    234.5 KB
  • 207.jpg
    207.jpg
    300 KB

Latest posts

Back
Top