I'm in as well. If we make Gerry's beam, I will do the flywheels,
crankshafts and most likley several other parts. There are approx.
60 separate parts, with multiples of some. Even with ten team members
that's a lot of parts per person. I suggest a few major parts and several smaller parts each. These would be linkages, pins, spacers, etc.
Are we using the metric plans or imperial? The metric plans do not
include a base, not sure about the imperial. We can also discuss fasteners
and if we want to supply them individually.
Based on prior team builds, communication is a good thing. Talking with
others about mating parts, fits and tolerances will pay off during assembly.
This will be a very ambitious project, and as a hobby, good results rather
than speed will make it more enjoyable.
Regards to all,
Maverick