Thanks for your kind comments. It is running on Coleman fuel with 5% WD40 added for lubrication. The Holt is finished now, I agree with you re: the cooling water piping, it needs to be larger in dia, my engine will run for 5 to 6 minutes before I feel it is getting hot enough, there is just not enough water circulating.
I found the cam tunnel the most difficult part, the drill did wander, even with the hardwood packing (would use aluminium if I built another), then a succession of between centre boring bars until it cleaned up, just on size. I had to trim the cylinders also to make them fit alongside each other. Here is the completed engine.
[ame]http://youtu.be/yy2CYju_sdE[/ame]
If I built another I would fit oil rings as my engine smokes a bit, even though clearances are pretty fine. I have a few small projects to finish off , then a Challenger V8 will be the next major project