got quite a few of the little tasks done today, here is the progress so far:-
Setting up for cutting the rads on the back of the cylinder
Rads are now cut on back of cylinder
Ali block been fly cut to form pedistal base
ceter drilled, drilled and tapped M4 ready for pedistal column
I ran a ball nosed cutter around pedistal base just for looks
Drilling Jig made - this is the marking out phase
Fly wheel set in rapid indexer
fly wheel been centered with milling head
fly wheel been drilled at 120 degree intervals
drilling and tapping hole in column for pedistal attachment
milling flats on the column
putting threads on both ends of pedistal column
the bits sof far
at this point my eyes were shot so stopped here for now, I am having dificulty in locating some 1/16 OD steel for the crankshaft and pivot pin, I think I will go and buy a few 1/16 drills and sabotage them
tomorow
I need to do the locking grub screw in the fly wheel
drill the column using the jig
turn down a crankshaft
buy some 1/16 drills
locate a spring
make an air inlet attachment
make a locking pin for the pivot pin
work out how the hell I am going to test it other than with lung capacity
![Wink ;) ;)](data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///yH5BAEAAAAALAAAAAABAAEAAAIBRAA7)